Shadow61's Blog


Got a lot done today !!!!
January 10, 2010, 3:33 am
Filed under: Uncategorized

well i got up early and went to the lumber store and got a load of materials. I picked up some concrete backer board for under the stove and behind it, I got my 12ft 2×4’s for the ceiling joists in the bunkroom, and 3 more rolls of insulation to finish up the small spaces in the walls.  I am doing all the work using only hand tools except for my cordless drill, all the wood is being cut using a hand saw and a mitre box as you will see in some of the pics. I got the bunkroom wall built, the ceiling joists in and the stove is set, just have to do the outside chimney pipe. here are some pics of the progress to this point.

Advertisements

1 Comment so far
Leave a comment

Dont forget-a coffe can or pot of water on top can help off set the dry heat created by the wood stoves dry heat!
bk

Comment by bk




Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s



%d bloggers like this: